TOWN OF HINGHAM

PLANNING BOARD

NOTICE OF DECISION

IN THE MATTER OF:

Applicant:         Jenny and Sandford Weymouth
                          79 Chandler Street, Apt. 3
                          Boston, MA  02116

Premises:        179 Main Street
                          Hingham, MA  02043   
           
                          Map 71, Lot 122

Deed Reference:    Plymouth Registry of Deeds; Book 42310, Page 126

Date:                October 7, 2013


Summary of Proceedings
This matter came before the Planning Board on the application of Jenny and Sandford Weymouth (Applicant) for 179 Main Street located in the Residential A District for Site Plan Review in association with a Building Permit under §I-H, §I-I and IV-B(6)(b)
of the Zoning By-Law and such other relief as necessary to raze an existing residential structure and above-ground pool, and construct a single family dwelling, detached garage and in-ground pool on the 1.5+/- acre lot in a different location.  The Applicant propose to abandon the existing private septic system and establish a sewer connection over an existing utilities and access easement (Sewer Commission voted approval 11/5/12). 

 
The Planning Board heard the application at a duly noticed hearing on October 7, 2013 at 7:00 PM in the Hingham Town Hall at 210 Central Street.  Members of the Planning Board present were: William Ramsey, Chairman; Gary Tondorf-Dick, Clerk; Sarah Corey; Judy Sneath; and Walter Sullivan Jr. 

Applicant’s Representatives:  Engineer Brendan Sullivan of Cavarnaro Consulting

John Chessia, Chessia Consulting Services, LLC reviewed the application for the Board.

Project Description and Findings
The Applicant proposed to raze an existing residential structure and above-ground pool, and construct a single family dwelling, detached garage and in-ground pool on the 1.5+/- acre lot in a different location.  The Applicant also proposed to abandon the existing private septic system and establish a sewer connection over an existing utilities and access easement.  The project was subject to site plan review because as proposed there is an alteration of 20,000 s.f. of land and an alteration of an existing slope of greater than 10% grade and 2,500 s.f. in area.
 
The Board discussed Mr. Chessia’s report of October 2, 2013.  Mr. Chessia’s findings recommend certain conditions that should be set forth as part of the Site Plan Approval.

Board members reviewed the project in accordance with the Site Plan Criteria contained in Section I-I (6) as follows:

a.    protection of abutting properties against detrimental uses by provision for surface water drainage, fire hydrant locations, sound and site buffers, and preservation of views, light and air, and protection of abutting properties from negative impacts from artificial outdoor site lighting;

The plans as presented and revised address these items satisfactory.

b.    convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets; the location of driveway openings in relation to traffic or to adjacent streets, taking account of grades, sight distances and distances between such driveway entrances, exits and the nearest existing street or highway intersections; sufficiency of access for service, utility and emergency vehicles;

The plans as presented meet this standard.

c.    adequacy of the arrangement of parking, loading spaces and traffic patterns in relation to the proposed uses of the premises; compliance with the off-street parking requirements of this By-Law;
The Board finds the plans as presented meet this standard.

d.    adequacy of open space and setbacks, including adequacy of landscaping of such areas;

The Board finds the plans as presented meet this standard.
e.    adequacy of the methods of disposal of refuse and other wastes resulting from the uses permitted on the site;
The Board finds the plans as presented meet this standard.
f.    prevention or mitigation of adverse impacts on the Town's resources, including, without limitation, water supply, wastewater facilities, energy and public works and public safety resources;
The Board finds the plans as presented meet this standard.
g. assurance of positive stormwater drainage and snow-melt run-off from buildings, driveways and from all parking and loading areas on the site, and prevention of erosion, sedimentation and stormwater pollution and management problems through site design and erosion controls in accordance with the most current versions of the Massachusetts Department of Environmental Protection's Stormwater Management Policy and Standards, and Massachusetts Erosion and Sediment Control Guidelines.
The Board finds the plans as presented do not include an erosion control plan write up or an Operation and Maintenance Plan, and as such, any approval should condition the submittal of both.

h.     protection of natural and historic features including minimizing: the volume of cut and fill, the number of removed trees of 6 inches caliper or larger, the removal of stone walls, and the obstruction of scenic views from publicly accessible locations;
The Board finds the plans as presented meet this standard.
i.    minimizing unreasonable departure from the character and scale of buildings in the vicinity or as previously existing on or approved for the site.
The Board finds the plans as presented meet this standard.
Decision and Vote:
The Planning Board moves to APPROVE the site plan as proposed on property known as 179 Main Street, as shown on plans entitled “SITE PLAN 179 MAIN STREET HINGHAM, MA 02043, PREPARED BY CAVANARO CONSULTING, DATED 9/7/13 AND REVISED TO 10/2/13,” with the following condition:
1.    Applicant shall provide an erosion control plan write up and an Operation and Maintenance Plan for review by Mr. Chessia and inclusion in the file.



_____________________________
William Ramsey, Chairman








NOTARIZATION


EXECUTED this _____ day of October, 2013


Commonwealth of Massachusetts


Plymouth, ss                            October ____, 2013

Then personally appeared William Ramsey, Chairman of the Hingham Planning Board, and acknowledged the foregoing to be the free act and deed of said Board.


_________________________        My Commission Expires:  July 22, 2016
Karen M. Clancy, Notary Public