View Other Items in this Archive | View All Archives | Printable Version

TOWN OF HINGHAM

PLANNING BOARD

NOTICE OF DECISION

Applicant:         Hennigan Engineering Co., Inc.
            55 Industrial Park Road   
            Hingham, MA  02043
           
            Map 201, Lot 7
           
Date:            August 19, 2013

Summary of Proceedings
This matter came before the Planning Board on the application of Hennigan Engineering Co., Inc. (Applicant) located at 55 Industrial Park Road in the Industrial Park and Hingham Development Overlay District in association with a Building Permit under §I-H and §I-I of the Zoning By-Law and such other relief as necessary to build a 4,000 s.f. one-story storage building which will house pressure washing equipment and related items currently stored outdoors. 

 
The Planning Board heard the application at a duly noticed hearing on August 5, 2013 at 7:00 PM in the Hingham Town Hall at 210 Central Street.  Members of the Planning Board present were: William Ramsey, Chairman; Gary Tondorf-Dick, Clerk; Judy Sneath; Walter Sullivan Jr. and Director of Community Planning Mary Savage- Dunham.

Applicant’s Representative: Thomas A Pozerski, P.E., Merrill Associates, Inc.

John Chessia, Chessia Consulting Services, LLC reviewed the application for the Board.

Project Description and Findings
The Applicant proposes to build a 4,000 s.f. one-story storage building which will house pressure washing equipment and related items currently stored outdoors. This will be beneficial for the equipment and the environment.  A small area of additional paving will be added to the site to enable sufficient room for trucks to access the building.  There will be a separate recharge facility for the roof runoff.  The new building will not interfere with current parking; loading and traffic maneuver areas on the site or off-site.

Mr. Pozerski described the drainage system in general and stated that the final design of the drainage was subject to the Conservation Commission who will hear the matter on August 12, 2013.  He stated the proposed location for the new building was the most appropriate spot to enable ongoing operations.  Mr. Pozerski also explained the existing drainage and pedestrian easement and stated that it was from the original layout of the park.  The Applicant is working with A.W. Perry’s (land owner) property manager to evaluate the easement and have it modified to allow the building project to move forward.  Ms. Savage-Dunham confirmed that Mr. Constable had advised her that he was working on a solution with the Applicant but that that process was not yet complete.  Ms. Savage-Dunham suggested a condition might be that the Applicant shall modify drainage and pedestrian access easement and submit revised plans prior to the issuance of the building permit.  

Mr. Chessia stated that he had reviewed the plans and said that there should be a condition for a note on the plans that the applicant will use white pavement markings for parking spaces, per the Zoning By-Law.  Mr. Chessia explained the drainage and pedestrian easement on the site and stated that part of it was in the area of the new building so that portion had to be revised in order to build the building.  He said there should be a condition requiring modification of easement as discussed. 

The Planning Board discussed the lighting and the Applicant stated that there would be no spillage over the property lines.  The Board then discussed the landscaping and parking, and Mr. Chessia pointed out that the proposed building was not visible from the road and was in the gated section of the property, not the public access portion of the property.

There were no other questions or comments from the abutters.

Board Members reviewed the project in accordance with the Site Plan Criteria contained in Section I-I (6) as follows:

a.    protection of abutting properties against detrimental uses by provision for surface water drainage, fire hydrant locations, sound and site buffers, and preservation of views, light and air, and protection of abutting properties from negative impacts from artificial outdoor site lighting;

The lighting is acceptable; there are no changes.

b.    convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets; the location of driveway openings in relation to traffic or to adjacent streets, taking account of grades, sight distances and distances between such driveway entrances, exits and the nearest existing street or highway intersections; sufficiency of access for service, utility and emergency vehicles;

As per plan

c.    adequacy of the arrangement of parking, loading spaces and traffic patterns in relation to the proposed uses of the premises; compliance with the off-street parking requirements of this By-Law;

Applicant is to note on plan that they will use white pavement markings for the     handicapped parking.

d.    adequacy of open space and setbacks, including adequacy of landscaping of such areas;

Landscaping as per plan
e.    adequacy of the methods of disposal of refuse and other wastes resulting from the uses permitted on the site;
No change
f.    prevention or mitigation of adverse impacts on the Town's resources, including, without limitation, water supply, wastewater facilities, energy and public works and public safety resources;
No Change

g. assurance of positive stormwater drainage and snow-melt run-off from buildings, driveways and from all parking and loading areas on the site, and prevention of erosion, sedimentation and stormwater pollution and management problems through site design and erosion controls in accordance with the most current versions of the Massachusetts Department of Environmental Protection's Stormwater Management Policy and Standards, and Massachusetts Erosion and Sediment Control Guidelines.
The applicant shall modify drainage and pedestrian access easement and submit revised plans prior to the issuance of the Building Permit; and, stormwater drainage design shall be as approved by the Conservation Commission.

h.     protection of natural and historic features including minimizing: the volume of cut and fill, the number of removed trees of 6 inches caliper or larger, the removal of stone walls, and the obstruction of scenic views from publicly accessible locations;
No comments

i.    minimizing unreasonable departure from the character and scale of buildings in the vicinity or as previously existing on or approved for the site.
No Comments
Decision and Vote:
It was moved, seconded and SO VOTED to grant site plan approval with conditions for the application and plans entitled “Site Plan Assessors Map 201 Lot 7 #55 Industrial Park Road Hingham, Massachusetts,” consisting of six (6) sheets and dated June 4, 2013 and revised thru July 20, 2013, and plan entitled “Photometric Plan Map 201 Lot 7 #55 Industrial Park Road Hingham, Massachusetts, “consisting of one (1) sheet and dated June 25, 2013, both prepared by Merrill Associates, Inc., Hanover, MA for Hennigan Engineering Company, Inc., with the following conditions:
1.    Applicant to note on plan that they will use white pavement markings for the     handicapped parking.

2.    The applicant shall modify drainage and pedestrian access easement and submit revised plans prior to the issuance of the building permit.

3.    The stormwater drainage design shall be as approved by the Conservation Commission.




_____________________________
William Ramsey
Chairman, Hingham Planning Board








NOTARIZATION


EXECUTED this _____ day of August, 2013


Commonwealth of Massachusetts


Plymouth, ss                            August ____, 2013

Then personally appeared Judith Sneath, Chairman of the Hingham Planning Board, and acknowledged the foregoing to be the free act and deed of said Board.


_________________________        My Commission Expires:  July 22, 2016