View Other Items in this Archive |
View All Archives | Printable Version
Board of Appeals
TOWN OF HINGHAM
Board of Appeals
SPECIAL PERMIT A1 DECISION
IN THE MATTER OF:
Applicant and Hingham Municipal Lighting Plant
Property Owner: 350 Lincoln Street
Hingham, MA 02043
Premises: 5.7 +/- acre portion of the 26.21 +/- acre parcel located at
31 Bare Cove Park Drive, at Map 69, Lot 44 Town of Hingham, recorded
with the Plymouth County Registry of Deeds at Book 3961, Page 701. The
overall parcel is identified as the "School Tract IV" parcel (the
"Property")
Deed Reference: Plymouth County Registry of Deeds Book 3961, Page 701
Plan Reference: Plan set entitled, "Hingham Municipal Lighting
Plant, New Operations Center," prepared by Symmes Maini & McKee
Associates, 100 Massachusetts Avenue, Boston, MA and Helene-Karl
Architects, Inc., 61 Skyfields Dr., Groton, MA , dated May 8, 2014
and revised through November 7, 2014, Sheets T1, C-101-102, C-111,
C-121, C-141, C-501- 504, L-1.1, A-1.1. A-3.1-3.2, and E-1.0-2.0
SUMMARY OF PROCEEDINGS:
This matter came before the Board of Appeals (the "Board") on the
application of Hingham Municipal Lighting Plant ("HMLP" and/or the
"Applicant") for a Special Permit A1 under Section I-F of the Hingham
Zoning By-Law (the "By-Law"), to construct a utility operations center,
approximately 24,000 square feet in size, on a 5.7 +/- acre portion of
the 26.21 +/- acre parcel located at Map 69, Lot 44 Town of Hingham,
recorded with the Plymouth County Registry of Deeds at Book 3961, Page
701. The overall parcel is identified as the "School Tract IV" parcel
(the "Property").
An initial public hearing was duly noticed and held on October 15,
2014, at the Town Hall, 210 Central Street. The Board panel consisted
of W. Tod McGrath, Chairman, Joseph M. Fisher, Vice-Chairman, and
associate member Mario Romania, Jr. The Applicant was represented by
Paul Heanue, HMLP General Manager, Attorney Jeffery A. Tocchio of Drohan
Tocchio & Morgan, P.C., Jeffrey S. Dirk, P.E., PTOE, FITE of
Vanasse & Associates, Inc., Peter S. Glick, P.E. of Symmes Maini
& McKee Associates, James P. Murphy, LSP of Tracey Environmental,
and Gregg Yanchenko of Helene-Karl Architects, Inc. The Board held a
second public hearing on November 19, 2014. Paul Brogna, Seacoast
Engineering, performed engineering peer review on behalf of the Board.
The Board voted unanimously to grant a Special Permit A1 for the Project
at the November 19, 2014 hearing.
BACKGROUND:
The Applicant proposes to construct an approximately 24,000 square
foot operations center which will provide garaging, storage,
administrative offices and customer service areas, related directly to
the public utility function of HMLP. The proposed uses constitute a
consolidation of uses presently undertaken at several locations within
the Town. Customer and business access shall be provided via an
existing internal driveway, which will be upgraded to accommodate safe
access for customers of HMLP and safe egress for the abutters at Adams
Court. Large truck and delivery access shall be provided at the
existing westerly DPW Facility curb cut on Bare Cove Park Drive. HMLP
also sought and obtained an Order of Conditions from the Conservation
Commission, Site Plan Approval and a Special Permit A3: Parking
Determination from the Planning Board.
FINDINGS and DECISION:
Based upon the information submitted and received at the hearings,
and other information available to the Board, the Board has determined
that:
a. The proposed use of the site is in harmony with the general
purpose and intent of this By-Law because construction of public utility
buildings/structures in the Official and Open Space Zoning District is
expressly allowed by Special Permit A1 under Section III-A (3.10) of the
By-Law, and is consistent with the Department of Public Works (DPW) use
located elsewhere on the parcel;
b. The proposed use complies with the purposes and standards of the
relevant specific sections of this By-Law. The proposed operations
center is a public utility building/structure and is a use allowed by a
Special Permit A1 under Section III-A (3.10) of the By-Law; the
proposed operations center meets the dimensional requirements under
Section IV-A of the By-Law; and HMLP has engaged in and obtained Site
Plan Approval and a Special Permit A3: Parking Determination from the
Planning Board, as well as an Order of Conditions from the Conservation
Commission;
c. The specific site is an appropriate location for such use,
structure, or condition, compatible with the characteristics of the
surrounding area. The Property is adjacent to an existing DPW Facility
which is located at an elevated grade. The grade change will
effectively block most light and sound from residential properties
located to the east. The Proposed Project is consistent with the
existing use of School Tract IV, which serves a substantial benefit to
the Town through the operation of the DPW Facility;
d. The use as developed and operated will create positive impacts or
potential adverse impacts will be mitigated. The HMLP operations center
will provide a positive impact to the Town through provision of
services that will be safe and well-designed for both customers,
visitors and employees of the public utility. The Project is
specifically designed to mitigate potential adverse impacts by improving
access to the DPW Facility, maintaining safe egress for those neighbors
using Adams Court, and improving safety by separating DPW trucks from
HMLP customer traffic. Moreover, the design and the operation of site
lighting will minimize the effects of light impacts during evening
hours. The site is currently disturbed by historic foundations and open
areas, adjacent to wetland resources. The Proposed Project will
stabilize the site, control uses, and drainage shall be constructed to
conform to the Stormwater Management Standards;
e. There will be no nuisance or serious hazard to vehicles or
pedestrians. The proposed improvement of the existing internal driveway
will improve transportation access to the Property, including access to
the DPW Facility, and egress from Adams Court; the existing roadway will
be rehabilitated and improved (widened) to convey two-way traffic
between the DPW Facility driveway and the Project Site, while improving
safer one-way egress from Adams Court. In addition, a connector roadway
will be constructed to link the service and maintenance facility
portion of the Project to the driveway that serves the DPW Facility
service and maintenance facility; this proposed access configuration
compliments the access and circulation patterns for the DPW Facility and
improves safety by efficiently separating DPW truck traffic from
customer vehicles. Vanasse Associates, Inc. concluded in its
Transportation Impact Assessment ("TIA") that the additional traffic
demands associated with the Project can be accommodated within the
confines of the existing and improved transportation infrastructure with
implementation of the specific recommendations detailed in the TIA. As
such, the Project will not create a nuisance or serious hazard to
vehicles or pedestrians;
f. Adequate and appropriate facilities exist or will be provided for
the proper operation of the proposed use. As detailed in the Plans
submitted to the Board, the Proposed Project is specifically designed to
allow safe access to the Property, and will include sufficient parking,
and provide stormwater management; all of the facilities included in
the proposed project are consistent with the public utility function of
HMLP. All utilities are, or will be, available to service the site; and
g. The proposal meets accepted design standards and criteria for the
functional design of facilities, structure, stormwater management, and
site construction. As set forth in the Plans submitted to the Board,
the proposed operations center meets the dimensional requirements under
Section IV-A of the By-Law and HMLP has sought and obtained Building
Permit Site Plan Approval and a Special Permit A3 from the Planning
Board, as well as an Order of Conditions from the Conservation
Commission.
For the reasons set forth above, the Board voted unanimously to grant a
Special Permit A1 under Section I-F of the By-Law approving
construction of a utility operations center, approximately 24,000 square
feet in size, on a 5.7 +/- acre portion of the 26.21 +/- acre parcel
located at Map 69, Lot 44 Town of Hingham, recorded with the Plymouth
County Registry of Deeds at Book 3961, Page 701, subject to the
following conditions:
1. The Applicant shall construct the Project in a manner consistent
with the approved plans and the representations made during the
hearings.
2. The HMLP shall mitigate noise by installing ambient noise level
self-adjusting back-up alarms on all of its vehicles equipped with
back-up alarms to minimize the level of noise generated from such
alarms, if so determined necessary at the time of the traffic monitoring
program report review required as a condition of the Planning Board's
Site Plan Approval.
3. All garage doors in the building shall be kept shut if work is being performed on vehicles or equipment at night.
4. To the greatest extent possible, all work performed on vehicles
and equipment will be performed inside the HMLP building. Pneumatic
power tools (air driven wrenches, etc) shall not be used outside the
building.
This decision shall not take effect until a copy of the decision
bearing the certification of the Town Clerk, that twenty (20) days have
elapsed since the decision has been filed in the office of the Town
Clerk and no appeal has been filed, or that if such appeal has been
filed, that it has been dismissed or denied, is recorded with the
Plymouth Registry of Deeds and/or the Plymouth County Land Court
Registry, and indexed in the grantor index under the name of the record
owner or is recorded and noted on the owner's certificate of title.
________________________________
Joseph M. Fisher
For The Board of Appeals